HomeJobCosts

Cost to Replace a Bathroom Countertop in 2026

A typical job is $850, in a range of $300 – $1,800. On its own that number means very little, so every figure on this page is drawn against the same $4,000 scale: against the other bathroom work you could be quoted for, and against the 20 metros where the job is priced.

Where this sits among bathroom work

national range, typical marked
Vanity Replacement
$1,500 Demolition
$1,500 Shower Pan
$1,400 Shower Door
$1,000 Vanity Top Replacement
$850 Shower Regrouting
$800 Sink
$650 Door
$600 Exhaust Fan
$550
$0$1k$2k$3k$4k

The same job, 20 metros

same $4,000 scale

Identical work, moved between labour markets. The whole range slides, so a dear metro's low can sit above a cheap metro's high. Colour runs with the metro's labour index, not with good or bad.

Chicago
$1,130 Seattle
$1,095 Minneapolis
$1,080 New York
$1,045 San Diego
$975 Portland
$975 Los Angeles
$970 Philadelphia
$950 Denver
$910 Las Vegas
$860 Phoenix
$840 Austin
$810 Houston
$790 Nashville
$790 Atlanta
$780 Charlotte
$780 Miami
$775 Dallas
$755 Tampa
$740 San Antonio
$725
$0$1k$2k$3k$4k

What the $850 is made of

Materials move with the market; labour moves with your metro. At 53% materials, only the smaller block is re-priced by the index — which is why a metro 33% above national does not raise this job by 33%.

Materials 53%
Labour 47%
$100 – $1,100 $200 – $700
$850
$300 $1,800
Vanity Top Replacement — national range

Put your own numbers on the scale

Trade and project are fixed to this page; changing the metro re-applies its labour index to every figure above.

Cost Calculator

$1,045
$370$2,215
estimated total cost
Labor$245 – $860
Materials$125 – $1,355
Total$370 – $2,215
23% above average in New York
Compare to Other Cities

To get exact pricing for your project, request written quotes from at least three licensed contractors in New York.

Based on aggregated data, replacing a bathroom countertop costs $300 to $1,800, with a typical job landing near $850. The top itself accounts for $100 to $1,100 and labor for $200 to $700, across 2 to 5 hours on site. The job keeps the vanity cabinet and changes only what sits on it, and it rarely needs a permit, because the plumbing reconnects where it already is.

The $1,500 spread inside that range comes from one decision more than any other: a stock top bought off a shelf, or a stone top cut to measure. A 37-inch cultured-marble top with its bowl molded in is a catalog item from about $120. A quartz or granite top fabricated for the same cabinet is priced by the square foot, carries a charge for every hole cut in it, and typically waits one to two weeks between measuring and setting. Both are “a new bathroom countertop” on a quote. The rest of this page prices each route separately, then shows where they meet.

Top Only, Sink Only or the Whole Vanity

Three neighbouring jobs get quoted under similar names, and the one that is actually wanted decides the bill.

JobWhat changesNational rangeTypical
Sink onlyBowl, faucet and drain; the top stays$280–$1,400$650
Top only (this page)Top, bowl if integral or pre-mounted; the cabinet stays$300–$1,800$850
Whole vanityCabinet, top, sink and faucet$500–$3,000$1,500

The middle row is the one with the most room to save. A top swap reuses the cabinet, the floor and wall finishes around it and the existing supply and drain positions, and it costs a little over half of a typical vanity replacement. It is also the job that most often gets upgraded by accident: an old undermount bowl that will not come free of its top, or a new bowl that does not match the existing opening, turns a bathroom sink installation into a top replacement on the day.

The fork the other way is the cabinet. A top is only worth replacing on a box that will outlast it, and the checks are quick: the base and toe kick are firm rather than swollen, the doors close square, the cabinet does not rock, and the width is a standard 24, 30, 36, 48 or 60 inches. When any of those fail, the comparison is against bathroom vanity installation at $500 to $3,000 rather than against a cheaper top.

Stock Vanity Tops by Material and Width

Stock tops are sold one inch wider than the cabinet they sit on, at a depth of 19 or 22 inches, so the overhang is already in the size. The prices below are retail catalog prices for a top with its bowl included — molded in for cultured marble and solid surface, mounted underneath for the stone and quartz tops — compiled from a home-centre catalog and a manufacturer’s own store.

Material31-inch top37-inch top61-inch doubleBowl
Cultured marble$90–$325$120–$305$735–$1,505Molded in, no cutout
Engineered marble$220$260$420Undermount, pre-mounted
Sintered stone$180$210$280 (single bowl)Undermount, pre-mounted
Granite, 2 cm—$220$380 (single bowl)Undermount, pre-mounted
Marble, 2 cm$270$300$500Undermount, pre-mounted
Solid surface$275–$650$320–$565$790–$1,405Molded in, no cutout
Quartz$220–$785$240–$880$1,110Undermount, pre-mounted
LaminateCut to orderCut to orderCut to orderDrop-in or integral

Three things in that table are worth reading twice.

The cheapest stone is not much dearer than the cheapest cultured marble. A 2 cm granite top with a bowl already fitted lists at $220 for a 37-inch cabinet, inside the cultured-marble band. The thin slab and the factory-standard size are what keep it there; the trade-off is a short color list and a faucet drilling fixed at the factory.

Solid surface costs more than its reputation suggests. At $320 to $565 for a 37-inch top it sits above the entry quartz tops. What it buys is a seamless bowl and a surface where a scratch or a small burn can be sanded out, which cultured marble’s gel coat does not allow.

Laminate has no comparable shelf price. Big-box stores sell laminate vanity tops cut to order, and at least one major home centre withholds the price online at the manufacturer’s request. The one published laminate figure is the opening itself — about $11 for a sink cutout at the counter — which says something about why laminate stays the low-cost route for odd widths.

Width matters less than the material column suggests. Moving from a 31-inch to a 37-inch top adds roughly $20 to $50 at the low end of each row, because a factory top is priced mostly by its mold or slab run rather than by its area. The jump comes at the double: two bowls, two faucet drillings and nearly twice the surface take a 61-inch top to between about one and a half and five times the price of the matching single.

Fabricated Stone Tops: How the Price Is Built

A stone top cut to measure is not priced as a product. Fabricator price lists build it from three lines, and two of them are published by shops that list their rates openly.

LinePublished rateWhat it covers
Stone, fabricated and installed$40–$120 per sq ft (one New Jersey shop, ten price levels)Cutting, polishing, standard edges, setting
Fabrication and installation only$36 per sq ft, $28 if the owner sets it (one Seattle-area shop)Labor and machining; stone billed separately by the slab
Undermount vanity sink cutout$125–$150 each; $75 each where a job has two or moreCut, route and polish the opening
Drop-in sink cutout$80Rough opening hidden by the sink rim
Faucet or fixture hole$10 eachOne per handle and spout
Decorative edge profile$19 per linear foot; three basic profiles freeBullnose, ogee, bevel and similar
Rush turnaround$200 to shorten a typical 2-week waitMoves the job up the shop schedule

Put together for a common case — a 37 by 22 inch top with a 4-inch backsplash, about 6.7 square feet — the arithmetic runs:

StepLow price levelHigh price level
6.7 sq ft × $40 or $120$268$804
One undermount vanity cutout$150$150
Three faucet holes$30$30
Fabricated top, set in placeabout $450about $985

That figure is the top, finished and sitting on the cabinet. It does not include the sink bowl, which most shops sell separately, or the plumbing, which a stone fabricator generally leaves to someone else. That split is why a fabricated top almost always produces two invoices.

The cutout is a fixed charge on a small job. On a 6.7 square foot vanity it is about a third of the bill at the low price level; on a 40 square foot kitchen the same kind of opening is a rounding error. A second bowl in the same top is cheaper per opening at one shop — $75 instead of $125 — which narrows the gap between a single and a double more than the square footage alone would.

Remnants change the stone line, not the others. A vanity top is small enough to come out of an offcut that a kitchen job left behind, and the price drops accordingly. One Washington fabricator publishes a flat $850 for any remnant top up to 60 inches and $1,200 from 61 to 96 inches, with two undermount cutouts, three faucet holes per sink, a 4-inch backsplash and polished edges included, ready in 5 to 7 business days. That is a pickup price; the top still has to be carried in, set and plumbed.

Templating is usually inside the price. None of the three shops whose rates are quoted here lists a separate template fee; one of them skips templating altogether and cuts from the customer’s own measurements. What templating does add is time — the two-week turnaround above is the normal gap between measuring and setting, and if the old top comes off at the measuring visit, the sink is out of service until the new one is set.

Labor: What the $200 to $700 Covers

ComponentLowTypicalHighShare of typical job
Top (including fabrication where cut to measure)$100$450$1,100~53%
Labor (removal, setting, plumbing reconnection)$200$400$700~47%
Total$300$850$1,800100%

The labor line is a sequence rather than a single task. The water is shut at the stops and the trap and supply lines come off. The old top is cut free of its caulk, unscrewed or unclipped from below and lifted away — the step that takes longest when a previous installer used construction adhesive. The new top is dry-fitted, shimmed level on the cabinet, bedded in silicone and sealed along the wall. Then the faucet and drain are fitted, ideally before the top goes down, and everything is reconnected and run.

Three things push labor toward the $700 end:

The low end is the opposite case: a stock cultured-marble top, an existing faucet that moves across to the new one, and one person on site for two hours.

Cost by City

The top is priced by the shop and the catalog, not by the metro, so only the labor half of the job moves with local wages. Applying the formula City Adjusted Cost = National Average × City Labor Adjustment Factor to the $400 labor portion of a typical job, with the $450 top held flat:

City Labor Adjustment Factor Adjusted Typical Job (top flat + labor scaled)Adjusted Labor Portion vs. National
Chicago, IL 1.33 $980$530 +33%
Minneapolis, MN 1.27 $960$510 +27%
Los Angeles, CA 1.14 $905$455 +14%
Atlanta, GA 0.92 $820$370 −8%
San Antonio, TX 0.85 $790$340 −15%

Labor adjustment factors are derived from BLS Occupational Employment and Wage Statistics (May 2025): the median ratio of local to national hourly wages across the trades that do this work. How this is calculated.

Chicago carries the highest labor factor in the dataset at 1.33 and San Antonio the lowest at 0.85. On this job the gap between them is about $200, because less than half of the bill is labor to begin with. The larger local swing is between fabricators: published per-square-foot levels at a single shop already span three to one, from $40 to $120. The calculator on this page applies any of the 20 city factors to the project directly.

DIY: Where the Saving Is Real

A stock top on a sound cabinet is one of the more approachable bathroom swaps, because nothing structural changes and every joint that could leak stays visible inside the cabinet.

ItemTypical cost
Cultured-marble top, 37-inch, bowl molded in$120–$305
P-trap$10–$30
Braided supply lines (pair)$16–$40
Drain assembly and pop-up$15–$60
Silicone, plumber’s putty, shims$10–$30
DIY total, faucet reused$170–$465
Professional replacement$300–$1,800

On a cultured-marble top the saving is roughly the labor line — $200 to $400 on the jobs at the lower half of the range. It shrinks on the other routes for physical rather than skill reasons:

The two checks that decide whether the new top fits before it is bought are the faucet drilling — single hole, 4-inch centerset or 8-inch widespread, matched to the faucet being reused — and the bowl’s drain position against the existing trap. A drain that lands a few inches off can usually be met with a longer tailpiece or an offset trap; one that lands behind a cabinet partition cannot.

Lifespan and Cost per Year

A published home-component life-expectancy chart puts cultured marble countertops at about 20 years, laminate at 20 to 30 and natural stone at 100 or more. That last figure is not the one that governs the arithmetic in a bathroom, because the stone outlives what it sits on. A prefab vanity cabinet typically lasts 10 to 15 years before its base fails, and a stone top cut for one cabinet seldom transfers cleanly to the next.

The useful reading is that a stone top on a tired cabinet is the poorest buy in the set. Where the cabinet has years left, the stone’s longevity counts; where it does not, a cheaper top now and a full vanity later costs less than a stone top that has to be removed again with the cabinet.

A worn cultured-marble top is also the one top that can be refinished rather than replaced. Recoating it is priced as an add-on to a tub visit at $150 to $300 in bathtub reglazing cost, which is less than the cheapest stock replacement once labor is counted.

What Drives the Price

The full set of bathroom scopes and their national figures is on the bathroom remodeling cost hub.

How to Reduce the Cost of a New Vanity Top

Last updated: November 2026. All figures reflect aggregated national cost data and published retail and fabricator price lists, and are not a quote for a specific bathroom. Actual pricing depends on the top material, size, cutouts, and local market. See the methodology page for how figures are calculated and sourced, or run a city-adjusted estimate on the cost calculator.

Questions

How much does it cost to replace a bathroom countertop?
Based on aggregated data, replacing the top on an existing bathroom vanity costs $300 to $1,800, with a typical job near $850. The top itself accounts for $100 to $1,100 and labor for $200 to $700, which covers lifting the old top off, setting and sealing the new one, and reconnecting the faucet and drain. A stock cultured-marble top sits at the floor of that range and a stone top fabricated to measure sits at the ceiling. The cabinet underneath is kept, which is what separates this job from a full vanity replacement.
Can you replace just the countertop on a bathroom vanity?
Yes, when the cabinet is sound and a standard width. Stock tops are sold 1 inch wider than the cabinet they sit on — 25, 31, 37, 49 and 61 inches for 24, 30, 36, 48 and 60 inch cabinets — at a depth of 19 or 22 inches, and the 3/4 to 1 inch overhang on each exposed side is built into that size. A cabinet with a swollen base, loose joints or an out-of-standard width is where a top-only job turns into a vanity replacement at $500 to $3,000.
What is the cheapest bathroom vanity top?
Cultured marble with a molded-in bowl. Retail catalog prices start at about $90 for a 31-inch top and $120 for a 37-inch top, with the sink already part of the casting, so there is no separate bowl to buy and no cutout to pay for. Big-box laminate tops are cheap to cut — one retailer charges $11 for the sink opening — but laminate is sold to order and its price is not displayed online, so it cannot be compared on the same footing.
How much does a sink cutout cost in a vanity top?
In stone, published fabricator price lists put an undermount vanity cutout, cut and polished, at $125 to $150, falling to $75 each at one shop when a job has two or more. A drop-in cutout, where the sink rim hides the edge, is listed at $80 and each faucet hole at $10. A cultured-marble or solid-surface top with an integral bowl has no cutout at all, and a laminate top is cut for about $11 at the store.
How much does a quartz vanity top cost?
A stock quartz top with an undermount bowl already mounted runs about $240 to $880 for a 37-inch width at retail. A quartz top fabricated to measure is priced by the square foot — $40 to $120 installed on one fabricator's published price levels — so a 37-inch top with a 4-inch backsplash, about 6.7 square feet, lands near $450 to $985 once the $150 cutout and three faucet holes are added. Plumbing reconnection is a separate line in both cases.
How much does a double vanity top cost?
A 61-inch top with two bowls runs about $735 to $1,505 in cultured marble, $790 to $1,405 in solid surface and about $1,110 in quartz at retail catalog prices. Fabricated in stone, the same top is roughly 11 square feet including a 4-inch backsplash, which at $40 to $120 per square foot plus two cutouts and six faucet holes comes to about $800 to $1,680 before plumbing. The second bowl also means a second drain and faucet to connect.
Is a stone remnant cheaper for a bathroom vanity top?
Usually, because a vanity top is small enough to come out of an offcut that a kitchen job left behind. One Washington fabricator publishes a flat $850 for any remnant top up to 60 inches, $1,200 from 61 to 96 inches, including two undermount cutouts, three faucet holes per sink, a 4-inch backsplash and polished edges, ready in 5 to 7 business days. That price is for pickup — setting the top and reconnecting the plumbing are not included.
Does the cost to replace a bathroom countertop vary by city?
Only the labor portion moves. Retail tops and fabricator square-foot prices vary by shop more than by metro, but the $400 labor line of a typical $850 job scales with local trade wages. Chicago carries the highest labor factor in this dataset at 1.33 and San Antonio the lowest at 0.85, so the same job spreads by roughly $200 between the two once the top price is held flat.

How the scale is built

Base ranges

Metro adjustment

Labor adjustment factors are measured from BLS metropolitan wage data: the median ratio of local to national hourly wages across the ten trades this site prices.

Drawing rules

Every chart on a page shares one axis unless its caption says otherwise. Bars are drawn from zero and are never truncated. Full method →

Last updated: November 2026

Estimates, not quotes. These cost estimates are based on aggregated data from public sources. Actual costs vary by project scope, contractor, and local conditions. Always obtain multiple written quotes from licensed professionals. This site sells nothing, lists no contractors and takes no payment for placement. Methodology →

Cost data last updated: November 2026

Related bathroom costs