Based on aggregated data, a professional full bathroom remodel runs $10,000 to $30,000. That figure splits three ways, and the split is the whole story of this page:
| Component of a full bathroom remodel | Low | Mid | High |
|---|---|---|---|
| Materials — fixtures, tile, vanity, valves, board, grout | $3,000 | $6,000 | $10,000 |
| Labor — the trade hours | $6,000 | $12,000 | $18,000 |
| Everything else — permits, inspections, disposal, delivery, fees | $1,000 | $2,000 | $2,000 |
| Total | $10,000 | $20,000 | $30,000 |
Doing it yourself removes exactly one of those three rows. Materials cost a homeowner what they cost a contractor, give or take a trade discount. Permits, dumpsters and delivery fees are indifferent to who swings the hammer. The $6,000 to $18,000 labor line is the entire prize, and every honest DIY number on this page is a fraction of it.
Almost nobody captures the whole line. Some of it is permit-and-inspection work. Some of it is priced so low per hour that the tools cost more than the labor saved. And some of it carries a failure cost — a shower pan whose labor line is $350 to $1,500 can surface, when it leaks, as a $350 to $5,000 subfloor repair.
So the useful question is not “how much can I save.” It is which labor dollars are actually capturable, and what is each one worth per hour of my own time. That is what the tables below answer, task by task.
The Three Numbers for Every Bathroom Task
Every project in the cost data carries a total, a materials figure and a labor figure. The labor column is the DIY saving, before tools. Sorted by the size of that labor line:
| Task | Pro total | Materials (DIY pays this) | Labor (the theoretical saving) | Permit typically required |
|---|---|---|---|---|
| Full bathroom remodel | $10,000–$30,000 | $3,000–$10,000 | $6,000–$18,000 | Yes |
| Small bathroom remodel | $3,000–$15,000 | $1,500–$7,000 | $1,500–$8,000 | Yes |
| Half bath remodel | $1,500–$12,000 | $700–$6,000 | $800–$6,000 | No |
| Tile shower | $1,200–$7,000 | $400–$3,000 | $800–$4,000 | No |
| Bathroom tile work | $1,500–$7,000 | $500–$3,000 | $900–$3,800 | No |
| Bathroom plumbing rough-in | $1,500–$5,000 | $300–$1,200 | $1,100–$3,500 | Yes |
| Bathtub replacement | $1,500–$8,000 | $400–$4,000 | $500–$3,500 | No |
| Shower regrouting | $300–$2,000 | $100–$400 | $200–$1,600 | No |
| Shower pan | $500–$3,500 | $150–$2,000 | $350–$1,500 | No |
| Vanity replacement | $500–$3,000 | $200–$1,500 | $250–$1,300 | No |
| Bathroom sink | $280–$1,400 | $50–$550 | $200–$850 | No |
| Shower door | $400–$3,000 | $200–$2,400 | $200–$600 | No |
| Shower valve | $200–$900 | $20–$350 | $150–$550 | No |
| Toilet installation | $200–$700 | $100–$400 | $100–$350 | No |
| Tile floor removal (demo) | $320–$1,120 | $20–$150 | $300–$970 | No |
| Room painting | $300–$1,200 | $50–$200 | $200–$900 | No |
Two patterns fall straight out of this table.
The labor share is not uniform. On a shower door, labor is a small slice — materials are $200 to $2,400 against $200 to $600 of labor, so a DIY door swap on a $2,400 frameless unit saves the smallest percentage of any task in the bathroom. On a shower regrout, the reverse: materials are $100 to $400 and labor is $200 to $1,600. Regrouting is almost pure labor, which is why it is one of the highest-percentage DIY jobs in the room and one of the lowest-dollar ones.
Two tasks carry a permit flag, and both are the ones where the trade hours are hidden inside a wall: the plumbing rough-in and the remodel itself. A permit attaches to the work, not to the person doing it. Doing the rough-in yourself removes the $1,100 to $3,500 labor line; it does not remove the permit, the inspection, or the fee.
Ranked by Saving Per Hour of Your Own Time
Total saving is the wrong ranking. A $2,100 tile job and a $700 vanity job are not comparable until the hours are in the denominator, and this is the number that no DIY cost guide publishes.
The arithmetic below is transparent: mid labor figure ÷ realistic first-timer hours, where first-timer hours are the trade’s typical duration multiplied by 2 to 3 — the accepted rule of thumb for a first attempt with no muscle memory, no jigs and no second set of hands.
| Task | Trade duration | Est. first-timer hours | Mid labor | Saving per hour of your time |
|---|---|---|---|---|
| Outlet / GFCI swap | 1–2 hrs | 2–6 | $220 | ~$55/hr |
| Bathroom sink | 2–4 hrs | 4–12 | $400 | ~$50/hr |
| Vanity replacement | 4–8 hrs | 8–24 | $700 | ~$45/hr |
| Shower valve | 2–4 hrs | 4–12 | $300 | ~$40/hr |
| Room painting | 4–8 hrs | 8–24 | $550 | ~$35/hr |
| Bathtub replacement | 1–3 days | 16–72 | $1,500 | ~$35/hr |
| Plumbing rough-in | 2–4 days | 32–96 | $2,200 | ~$35/hr |
| Light fixture / exhaust fan | 1–4 hrs | 2–12 | $250 | ~$35/hr |
| Toilet installation | 2–4 hrs | 4–12 | $200 | ~$25/hr |
| Shower door | 3 hrs–1 day | 6–24 | $350 | ~$25/hr |
| Shower pan | 1–2 days | 16–48 | $800 | ~$25/hr |
| Tile shower | 3–5 days | 48–120 | $1,700 | ~$20/hr |
| Bathroom tile work | 3–7 days | 48–168 | $2,100 | ~$20/hr |
| Shower regrouting | 1–2 days | 16–48 | $600 | ~$20/hr |
| Tile removal / demo | 4 hrs–2 days | 8–48 | $500 | ~$20/hr |
The ranking inverts the usual advice. Tile is the task most DIY guides push hardest, and it sits at the bottom of this table at roughly $20 per hour — not because the labor line is small ($900 to $3,800 is the second-largest in the bathroom) but because the hour count is enormous. A first-timer tiling a bathroom floor and a shower surround is looking at 48 to 168 hours. That is four to fourteen full weekends to earn $2,100.
Meanwhile a bathroom sink swap returns about $50 an hour and is finished in an evening, and a vanity replacement about $45 an hour — provided the supply and drain stay where they are. Those are the highest-value hours in the room, and they are gone in a weekend.
Demo is the surprise. It reads as free money — no skill, no permit, nothing to install. But at $300 to $970 of labor for 8 to 48 hours of your own swinging, plus the dumpster, it earns about $20 an hour, the same as tile. Demo is capturable, but it is not where the money is.
The Three Tiers, Argued From the Numbers
Tier 1 — high dollar per hour, no permit, no hidden failure cost
Every task here shares three properties in the data: no permit flag, a short duration even when tripled, and a failure that is visible immediately and costs little more than the part.
- Vanity replacement — labor $250 to $1,300, no permit, done in a day and a half of DIY time. The condition is that the supply lines and the P-trap stay put. Move the drain and the job becomes a rough-in.
- Toilet installation — labor $100 to $350. The lowest labor line in the bathroom, and a task where a mistake is a wax ring, not a wall.
- Bathroom sink — labor $200 to $850, the best dollar-per-hour in the room.
- Painting — labor $200 to $900 on a room, materials only $50 to $200. Roughly 80 percent of a paint job is labor.
- Shower regrouting — labor $200 to $1,600 against $100 to $400 of materials. The highest labor percentage of any bathroom task, and the reason a tired shower often gets a $200 refresh instead of a $5,000 remodel.
- Accessories, mirror, towel bars, hardware — no trade line at all, because no contractor prices them separately. They are pure materials.
Tier 2 — the labor line is real, but so is the hour count
- Bathroom tile work — labor $900 to $3,800. The second-biggest capturable line in the bathroom and the slowest way to capture it, at roughly $20 per hour. Tile is also the task with the largest tool bill (below).
- Shower door — labor $200 to $600 only. Materials dominate this job at $200 to $2,400, so the DIY saving is capped near $600 no matter how expensive the glass.
- Bathtub replacement — labor $500 to $3,500, but a cast-iron tub weighs 300 to 500 pounds and the alcove is 30 inches wide. The labor figure is high because the removal is hard, not the install.
- Shower valve — labor $150 to $550. A short job with a long tail: the valve sits inside the wall, so the failure is discovered after the tile is back on.
Tier 3 — the labor line is large and so is the cost of getting it wrong
This tier is not defined by difficulty. It is defined by what the repair costs when it fails, which is a number this site prices.
- Shower pan and waterproofing — labor $350 to $1,500. A membrane that fails does not announce itself; it surfaces months later, below the bathroom, as subfloor repair at $350 to $5,000, from a patch to the whole floor, and water-damaged floor repair at $1,200 to $5,000 or more per room. The saving is $350 to $1,500; the downside can run several times that.
- Plumbing rough-in — labor $1,100 to $3,500, and the only bathroom task besides the remodel itself that carries a permit and an inspection in the data. Supply and drain lines are buried behind finished walls. A joint that weeps costs $200 to $2,000 in pipe repair plus every finish in front of it.
- Electrical — an outlet swap is the highest dollar-per-hour task in the room at about $55, and a bathroom circuit is also GFCI-protected, wet-location and inspected. The International Residential Code is the document that governs the requirement, and the inspection happens whoever wires it.
State it as arithmetic and the tier is obvious without a word of advice: Tier 3 is where the ratio of downside to saving is worst. Shower pan saves at most $1,500 and risks $3,000. A vanity saves up to $1,300 and risks a $30 P-trap.
The Tool Bill: What Converts a “Saving” Into a Net Figure
Almost every DIY cost guide quotes the labor saving and stops. The tools are a real cash outflow, they land before any saving is realized, and on the small tasks they can exceed it.
| Tool | Buy | Rent | Which tasks need it |
|---|---|---|---|
| 7-inch wet tile saw (homeowner grade) | $90–$250 | $50–$70/day | Tile floor, tile shower, shower pan |
| Contractor wet saw with sliding table | $400–$700 | $60–$90/day | Large-format tile |
| Tile nippers + manual score-and-snap cutter | $25–$70 | — | Tile |
| Notched trowels (2 sizes) + margin trowel | $20–$45 | — | Tile, backer board, pan |
| Grout float, sponges, buckets, mixing paddle | $40–$80 | — | Tile, regrout |
| Tile leveling system (clips + wedges) | $25–$60 | — | Large-format tile |
| Oscillating multi-tool + grout blades | $40–$150 | $25–$35/day | Regrout, trim, undercutting jambs |
| Reciprocating saw | $60–$180 | $25–$40/day | Demo, tub removal |
| 4-ft level + torpedo level | $35–$90 | — | Vanity, door, pan, tile |
| Stud finder | $20–$50 | — | Vanity, grab bars, blocking |
| PEX crimp tool + rings | $40–$150 | $20–$30/day | Rough-in, valve, sink |
| Basin wrench | $12–$25 | — | Sink, faucet, toilet |
| Pipe wrench + channel locks | $30–$70 | — | Toilet, tub drain |
| Pry bar + demolition bar | $15–$40 | — | Demo |
| P100 respirator (tile and backer cutting release silica dust) | $20–$45 | — | Demo, tile cutting |
| Knee pads, dust barrier / zip pole | $40–$95 | — | All |
| Caulk gun | $10–$25 | — | All |
| Bagged debris pickup | $30–$40 bag + $150–$250 pickup | — | Demo |
| 10-yard dumpster | — | $300–$550/week | Full remodel demo |
A first-time full-bathroom DIY tool kit lands at $350 to $1,100, assuming a drill and basic hand tools already exist. Against a $12,000 mid-range labor line that is noise. Against a $200 toilet-swap labor line, a $150 tool purchase eats three-quarters of the saving.
Rent or buy: the break-even
The wet saw is the only real decision, because it is the one expensive tool and the one with a healthy rental market.
- Rental: $50 to $70 per day.
- Purchase: $90 to $250 for a 7-inch homeowner saw.
- Break-even: 2 to 4 rental days.
The trap is that a rental day is a calendar day, not a working day. A first-timer tiling a bathroom is inside a 48 to 168 hour window spread across weekends — the saw is needed on day 1, day 4 and day 9 for the cuts that were measured wrong. Rented, that is three to five days at $50 to $70; bought, it is one payment of $90 to $250 and the saw is there when the last cut is discovered. Rental wins on a single-day job — one small floor, one weekend — and loses on anything with a shower in it.
The oscillating tool follows the same logic in miniature ($40 to $150 buy against $25 to $35 a day). The reciprocating saw and the dumpster are genuine one-shot rentals.
Net saving after tools, on the mid figures:
| Task | Mid labor | Tools not in a normal kit | Net saving |
|---|---|---|---|
| Bathroom sink | $400 | $40 | $360 |
| Vanity replacement | $700 | $75 | $625 |
| Toilet installation | $200 | $25 | $175 |
| Shower valve | $300 | $150 | $150 |
| Shower door | $350 | $60 | $290 |
| Shower regrouting | $600 | $120 | $480 |
| Room painting | $550 | $100 | $450 |
| Tile removal / demo | $500 | $250 | $250 |
| Bathroom tile work | $2,100 | $450 | $1,650 |
| Tile shower | $1,700 | $500 | $1,200 |
| Shower pan | $800 | $150 | $650 |
| Plumbing rough-in | $2,200 | $300 | $1,900 |
Tools are bought once and shared across tasks, so the column above double-counts the tile saw for anyone doing both the floor and the shower. The realistic project-level figure is the $350 to $1,100 kit, deducted once.
The City Effect: DIY Is Worth Far More in Chicago Than in San Antonio
This is the part of DIY arithmetic that every national guide misses, and it follows directly from the split at the top of this page.
Material prices are broadly national. A toilet, a vanity, a box of porcelain, a PEX manifold — the price is set by manufacturers and big-box distribution, not by the local labor market. Labor is what varies by metro. And DIY removes labor and nothing else.
Therefore: the value of doing the work yourself scales with the local labor factor. The same bathroom, the same materials, the same weekends — and the labor a homeowner displaces is worth thousands more in a high-wage metro.
| City | Labor Adjustment Factor | Pro cost (materials + labor) | DIY cost (materials only) | Labor displaced by DIY | vs. National |
|---|---|---|---|---|---|
| Chicago, IL | 1.33 | $21,960 | $6,000 | $15,960 | +33% |
| Seattle, WA | 1.29 | $21,480 | $6,000 | $15,480 | +29% |
| New York, NY | 1.23 | $20,760 | $6,000 | $14,760 | +23% |
| Philadelphia, PA | 1.12 | $19,440 | $6,000 | $13,440 | +12% |
| Houston, TX | 0.93 | $17,160 | $6,000 | $11,160 | −7% |
| San Antonio, TX | 0.85 | $16,200 | $6,000 | $10,200 | −15% |
Mid-range full bathroom remodel: $6,000 materials + $12,000 labor nationally. Materials are held flat; only the labor line is scaled by the metro factor. The $1,000–$2,000 of the compiled total that the materials and labor bands do not cover is excluded from both columns.
Labor adjustment factors are derived from BLS Occupational Employment and Wage Statistics (May 2025): the median ratio of local to national hourly wages across the trades that do this work. How this is calculated.
The spread is the point. On the identical mid-range bathroom, the labor a homeowner displaces is worth more than $5,700 extra in Chicago than in San Antonio — and that gap alone is larger than the entire labor line of most single tasks in the room.
The same effect shows up on any one task. Tile work, the biggest single capturable line after the rough-in:
| City | Labor Adjustment Factor | Pro cost | DIY cost (tile + thinset + grout) | Labor displaced by DIY | vs. National |
|---|---|---|---|---|---|
| Chicago, IL | 1.33 | $3,995 | $1,200 | $2,795 | +33% |
| Seattle, WA | 1.29 | $3,910 | $1,200 | $2,710 | +29% |
| Minneapolis, MN | 1.27 | $3,865 | $1,200 | $2,665 | +27% |
| Denver, CO | 1.07 | $3,445 | $1,200 | $2,245 | +7% |
| Atlanta, GA | 0.92 | $3,130 | $1,200 | $1,930 | −8% |
| San Antonio, TX | 0.85 | $2,985 | $1,200 | $1,785 | −15% |
Mid-range bathroom tile work: $1,200 materials + $2,100 labor nationally.
Labor adjustment factors are derived from BLS Occupational Employment and Wage Statistics (May 2025): the median ratio of local to national hourly wages across the trades that do this work. How this is calculated.
The practical consequence, stated as arithmetic: the same 100 hours of tiling is paid at a different rate depending on the ZIP code. In San Antonio those 100 hours displace roughly $1,785 of labor — about $18 an hour. In Chicago they displace roughly $2,795 — about $28 an hour. The tile is the same tile.
Run any project through the cost calculator to see the metro-adjusted split for a specific city, and the methodology page for how the factors are derived.
What DIY Does Not Remove From the Bill
The saving is the labor line and nothing else. Five costs are completely indifferent to who does the work:
1. Materials — unchanged. $3,000 to $10,000 on a full remodel. A contractor’s trade discount at a supply house may run 5 to 20 percent on some lines, which means a homeowner sometimes pays slightly more for the same fixtures than the pro bid assumed.
2. Permits and inspections — unchanged. The full remodel, the small remodel and the plumbing rough-in all carry a permit flag in the data. The fee is the fee.
3. Disposal — unchanged, and usually worse. A gutted bathroom generates a tub, a toilet, a vanity, backer board, tile and framing. A 10-yard dumpster runs $300 to $550 a week; bagged pickup is $30 to $40 per bag plus $150 to $250 for collection. A contractor’s price already has this inside it; a homeowner writes the check separately and then notices it.
4. Delivery. Tubs, vanities and pallets of tile are freight, not car cargo.
5. Time — the cost nobody prices. Aggregated data puts a professional full remodel at 2 to 4 weeks. A first-timer runs 2 to 3 times the trade hours, and those hours are spread across evenings and weekends rather than worked consecutively — so the elapsed job commonly runs 6 to 16 weeks. In a one-bathroom household that is the real price of a $12,000 saving, and it is paid in a currency no cost table has a column for. The professional timeline is broken down in how long a bathroom remodel takes.
Those first four rows are exactly the $1,000 to $2,000 in the opening table that is neither materials nor labor. They do not go away.
What a Mistake Costs
DIY risk is usually written as a warning. It is more useful as a price list, because every one of these repairs is a line in the same cost data.
| What fails | Where it shows up | Cost to put right |
|---|---|---|
| Shower pan liner / waterproofing membrane | Ceiling below, subfloor, joists — months later | Subfloor repair $350–$5,000; water-damaged floor repair $1,200–$5,000+ per room |
| Tile set on an out-of-plane wall or unflattened floor | Lippage, cracked grout lines, cracked tile | Tile removal $320–$1,120 + reinstall $1,500–$7,000 |
| Grout mixed wrong or applied over a wet bed | Crumbles, stains, cracks within a season | Regrouting $300–$2,000 |
| Supply joint weeping inside a wall | Stain on the ceiling below | Pipe repair $200–$2,000 + finishes |
| Shower valve set at the wrong depth in the wall | Escutcheon will not seat; trim will not fit | Valve replacement $200–$900 + tile-out |
| Drain flange not bonded to the pan | Slow leak straight into the framing | Shower pan $500–$3,500, redone |
The pattern: the cheap mistakes are the ones you can see, and the expensive ones are the ones behind tile. A wonky vanity is visible in an hour and free to fix. A pinhole in a pan liner is invisible for a year and costs multiples of the labor it saved.
One more line item sits outside the failure table. In homes built before 1978, disturbing painted surfaces brings the EPA’s Renovation, Repair and Painting rule into scope, and the rule is written around certified renovators — a constraint on who can be paid to do the work, and a testing cost either way.
A Realistic Partial-DIY Budget
Nobody does all of it and nobody does none of it. The common split — and the one the numbers support most strongly — is: homeowner takes the whole of Tier 1 plus demo and the tile; the buried, permitted and waterproofed work is bid out.
Working from mid-range figures on a full bathroom remodel:
| Line | Full pro | Partial DIY | Full DIY |
|---|---|---|---|
| Materials | $6,000 | $6,000 | $6,000 |
| Part of the compiled total not attributed to materials or labor | $2,000 | $2,000 | $2,000 |
| Labor — plumbing rough-in | $2,200 | $2,200 (hired) | $0 |
| Labor — tiled shower | $1,700 | $1,700 (hired) | $0 |
| Labor — everything else (demo, vanity, toilet, sink, floor tile, door, paint, trim, accessories) | $8,100 | $0 — captured | $0 — captured |
| Tools | — | $700 | $700 |
| Total | $20,000 | $12,600 | $8,700 |
| Saving | — | $7,400 (37%) | $11,300 (57%) |
| Elapsed time | 2–4 weeks | 6–12 weeks | 10–16 weeks |
The 37 percent figure is not a rule of thumb — it is what falls out of the data when the two highest-consequence labor lines ($3,900 of the $12,000) stay with a trade and the rest is captured. The full-DIY 57 percent assumes zero rework, which is the assumption that the failure table above is about.
And the same partial-DIY split is worth $10,773 in Chicago and $6,885 in San Antonio, because the $8,100 of captured labor scales with the metro factor while the $6,000 of materials and $700 of tools do not.
DIY by Bathroom Size
The labor line — and therefore the ceiling on DIY — scales with the room.
| Project | Pro total | DIY materials | Labor available to capture | Permit |
|---|---|---|---|---|
| Half bath (toilet + sink, no shower) | $1,500–$12,000 | $700–$6,000 | $800–$6,000 | No |
| Small bathroom | $3,000–$15,000 | $1,500–$7,000 | $1,500–$8,000 | Yes |
| Full bathroom | $10,000–$30,000 | $3,000–$10,000 | $6,000–$18,000 | Yes |
The half bath is the highest-yield DIY project in the house, and it is the one nobody writes about. No shower means no pan, no membrane, no tiled wet wall — the entire Tier 3 list is absent. What remains is a toilet, a sink or small vanity, a floor, paint and a light: $800 to $6,000 of labor, all of it in Tier 1 or Tier 2, none of it permitted, and none of it carrying a water-intrusion failure cost.
The full bathroom is the opposite: the biggest labor line in the house and the highest concentration of Tier 3 work inside it.
The pro side of this same arithmetic — what the trades actually charge, hour by hour and line by line — is broken out in bathroom remodel labor cost.
Budgeting a DIY Bathroom: The Order the Money Leaves
A contractor’s bathroom is billed in stages — a deposit, a progress payment at rough-in, a balance at completion — and the labor is spread across those stages. A DIY bathroom has no labor payments at all, which sounds like a cashflow advantage and is in fact the opposite: the entire budget is front-loaded into materials and tools, and both land before a single fixture is set.
Working the mid-range full remodel in order:
| Stage | What is bought | Typical share of the DIY budget | When |
|---|---|---|---|
| Before demo | Tools ($350–$1,100), dumpster or bags ($150–$550), dust barrier, permit | ~20% | Week 1 |
| Demo and rough-in | PEX, fittings, drain, valve body, blocking, backer board | ~15% | Weeks 1–3 |
| Waterproofing and tile | Membrane, pan, thinset, tile, grout, sealer | ~30% | Weeks 3–8 |
| Fixtures | Tub or shower base, toilet, vanity, sink, faucet, door | ~30% | Weeks 6–10 |
| Finish | Paint, trim, mirror, lighting, hardware, accessories | ~5% | Weeks 10+ |
Three consequences follow from this ordering, and they are the ones that quietly move a DIY budget.
The tile order is placed before the tiling skill exists. Tile is bought by the box, and a first-timer’s waste rate on cuts runs well above a tiler’s. Aggregated practice is a 10 to 15 percent overage on tile — on a $500 to $3,000 bathroom tile material line that is $50 to $450 of extra tile, and running short mid-job means a second order from a different production batch with a visible shade difference.
The valve is the cheapest item with the most expensive position. A shower valve body is $20 to $350 of material. It is installed at rough-in, buried at waterproofing, and covered at tile. Every task after it depends on it being set at the correct depth and orientation, and the cost of finding out otherwise is not the $120 valve — it is the tile in front of it.
Contingency is not optional arithmetic in a DIY budget; it is the room where the failure table lives. The repairs listed above — a $350 to $5,000 subfloor repair, a $320 to $1,120 tile-out, a $300 to $2,000 regrout — are all larger than any single Tier 1 saving. A contingency of 10 to 20 percent of the materials line ($300 to $2,000 on a full remodel) is the number that absorbs one of them without stopping the project.
There is one budget line DIY genuinely creates rather than removes: an unusable bathroom for 6 to 16 weeks. In a two-bathroom house that is an inconvenience with no dollar figure. In a one-bathroom house it is the largest hidden cost on this page.
Related Costs
- Bathroom remodel labor cost — the same labor line, priced from the contractor’s side
- Small bathroom remodel cost and half bath remodel cost — the two rooms where DIY yields the most per hour
- Bathroom tile installation cost and tile shower installation cost — the biggest labor line, and the slowest to capture
- Shower pan installation cost and bathroom plumbing rough-in cost — the permitted, buried work
- Vanity installation cost, toilet installation cost, bathroom sink installation cost — the Tier 1 swaps
- Shower regrouting cost and shower door installation cost
- Tile removal cost and tile installation cost — demo and floor
- Subfloor replacement cost and water damaged floor repair cost — what a failed pan costs
- All bathroom remodeling costs · Cost calculator · Methodology